top of page
Search

Ravine House construction begins

  • Writer: Francis Lapointe
    Francis Lapointe
  • Nov 17, 2011
  • 1 min read

The Ravine House site has been excavated according to stringent conditions laid out in the Site Plan Control process. To date, footings have been poured and the contractor, Mike Holmes is preparing to pour the foundation walls.


 
 
 

コメント


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© Copyright 2001 Lapointe Architects

bottom of page