River House construction begins

November 7, 2011

Mike Holmes and The Holmes Group have started the construction of River House and have installed silt fencing. Tree hoarding and the pool has been covered. The deep foundations designed to resist future shore erosion are in the ground. The detached garage and the house are being built at the same time.

 

1/3

 

 

Share on Facebook
Share on Twitter
Please reload

USGBC GreenBuild Conference and Expo. Off-Site Education Session Planning

October 13, 2011

1/10
Please reload

April 30, 2012

Please reload